 Located in Novolukoml Lukomlskaya SDPP is the most powerful power plant in the republican power industry. Its installed capacity is 2889.5 MW. The annual electrical energy generation is 7.5 - 12 billion kWh. The fuel consumption rate per electrical energy supply in 2019 amounted to 287.1 g/kWh. The fuel consumption rate per heat supply in 2019 amounted to 168.41 kg/Gcal. The number of staff is 1625 persons.

The construction of Lukomlskaya State District Power Plant began in 1964. December 22, 1969 the first 300 MW power unit was launched. In 1992 the power plant started to incinerate natural gas. Stage improvement of the major and auxiliary equipment at Lukomlskaya SDPP was carried out between 2003 and 2013 in order to increase its reliability, efficiency, lifetime and operational performance. 427 MW Combined-Cycle Gas Turbine was commissioned in May 2014.

211162, Vitebsk region, Chashniki district, Novolukoml

Tel: 8(02133) 3 83 59

Факс: 8(02133) 3 45 41, 3 45 39

E-mail: lgres@vitebsk.by

Information
Administrative Procedures
Connection to the Electric Power Supply System