• Triangle No light? Call: 144

Polotsk CHPP

Card image cap

43–53 млн кВт·ч

Annual electric power generation

7,7 МВт

Rated Output Power

355 человек

Number of Personnel

Its installed capacity is 7.7 MW. Annual electrical energy generation is 43-53 million kWh. Annual heat supply is 200-225 thousand Gcal. The number of staff is 355 persons.

It was commissioned in December 1946. The worn out turbine was replaced with the turbine generator P 6–3.4 / 0.5–1 with a capacity of 2.5 MW in 2003. Electrical energy generation increased more than threefold. At present, the branch comprises a regional boiler-house “Ksty”, District heat networks and a modular boiler-house “Vesnyanka”.

211406, Vitebsk region, Polotsk, 13 Y. Kupaly str.

Tel: 8 (0214) 41-48-59

Факс: 8 (0214) 42-22-24

E-mail: pst@vitebsk.energo.by

Information
Administrative Procedures
Connection to the Electric Power Supply System