245 – 285 млн кВт·ч
Annual electric power generation
80 МВт
345 человек
Number of Personnel
Its installed capacity is 80 MW. Annual electricity generation is 0.245-0.285 billion kWh. Annual heat output is 615-705 thous.Gcal. The number of staff is 345 people.
Vitebsk CHPP was commissioned in December 1954. In 2006, the worn out turbine unit No. 3 with a capacity of 35 MW was replaced for a new one with a capacity of 40 MW. In 2011, the worn out turbine unit No. 2 with a capacity of 35 MW was replaced with a new one with a capacity of 40 MW.
210604, Vitebsk, 104 M.Gorkogo str.
Tel: 8 (0212) 37-34-01
Факс: 8 (0212) 37-34-41