• Triangle No light? Call: 114
Information
Administrative procedures
Connection to the power supply system
Scheduled outages

Design department performs work on a contract basis for the design of 0.4-10 kV electricity networks and heating networks to obtain a positive conclusion Gosstroyekspertizy. 

The certificate of conformity №0001917-OL 
Сertificate of conformity №0000910-PP 
Quality Management System Certificate of Conformity STB ISO 9001-2015

Phone: 
8 (0212) 492-447  
8 (0212) 492-364

Phone: 
8 (0212) 492-577  
8 (0212) 492-552