History of the Vitebsk power system development

The first commercial power station in Vitebsk region was built in Vitebsk in 1898 and was intended to power the tram and the lighting of the city center. 
The development of large-scale power in the country began with the Vitebsk region, when it was put into operation the Belarusian state district power station in 1930. In the same period it was built and the first power line. 
During the years of formation and development of Vitebsk energy system built power plants in Vitebsk, Orsha, Polotsk and Novopolotsk.

Around the middle of the 60s in Belarus again began to be felt an acute power shortage and as a consequence, began searching for a way out. And he was the only one - to increase power. So it was decided to build on the banks of a large lake Lukoml new power plant - Lukoml, which announced a major Komsomol building. 
In December 1969, on the Day of Energy has been successfully put into operation the first unit of 300 MW Lukoml, which solved the problem of power supply of the North-West region of the country.


Polotsk Hydroelectric Power Station. Commissioned on June 30, 2017.Vitebsk hydroelectric station. Commissioned on July 31, 2017.The substation 330 kV Postavy. Commissioned on July 31, 2017. 23October 2017, the implementation of the project Energy-saving winter greenhouses with an area of 4.38 hectares in the town of Orekhovsk, Orshansky district.

10.02. Implemented one of the most important stages of the project Construction of Vitebsk Hydroelectric Power Station on the Western Dvina River - overlapping of the bypass channel of the Vitebsk Hydroelectric Power Station.11.03. Siemens SST -110/060 TANDEM turbine commissionedwith an installed capacity of 12.825 MW at the Orsha Thermal Power Plant.

March. Commencement of work on replacement of turbine unit R-6-35 / 6, station No. 1 at the Orsha CHP Plant.April. The implementation of 8 PK Construction of PS-330 kV Postavy. June. The reconstruction of the Boginsk hydroelectric station of the Braslavsky district has been completed.

On 01/01/2014, the main construction and installation work on PGU-400 on theLukoml State District Power Plant. On May 29, 2014, a combined-cycle gas turbine was commissionedInstallation at Lukoml State District Power Plant with an installed capacity of 427 MW.

December 2013. Completed the construction of mini-CHP on local fuels inBarani.

January 18, 2012. Opening ceremony of the PGU-400 MW construction siteat Lukoml State District Power Plant. 2012. Modernization of the power unit No. 3 of Lukoml State District Power Plant.

March 23, 2011. A contract was signed for the construction of a mini-CHP at local onestypes of fuel at the boiler house Baran in Orsha with POLYTECHNIK LLC. December 21.2011. At Vitebsk CHP replaced turbine number 2 with a capacity of 35 MW with a new onewith a capacity of 40 MW. 2010-2011. Modernization of the power unit No. 4 of LukomlskyGRES (II, III stage).

2000

27.06. Vitebsk Production Association of Energy and Electrification (PO "Vitebskenergo") has been renamed to Vitebsk republican unitary enterprise of electric power "Vitebskenergo" (RUE "Vitebskenergo").

December. Commissioned turbine of 3.5 MW low-potential pair to the district boiler room "East" in Vitebsk.

2001

06.08. Concern "Belenergo" approved "technical re-equipment and reconstruction plans Lukoml in the period 2001-2010."

2003

13.02. At Lukoml the first time in Belarus after the upgrade is included in the work unit number 3 with the power increase by 7-10 MW.

12.03. Polotsk HPP put into operation 6 MW turbogenerator.

2005

18.05. The structure of "Vitebskenergo" came PMC SHP "Spring" as a branch of "Spring-energy."

25.12. On Vitebsk HPP put into operation turbogenerator number 3 capacity of 40 MW turbine PT-35 \ 40-8,8.

2006

July. Upgrading unit № 1 Lukoml with increasing power of 15 MW.

Commissioned expander-generator set DGUE 2500 kW number 2 at Lukoml.

December. On BelGRES it administered complex of power for burning wood and peat.

2007

26.04. Put into operation the first turn of the reconstructed 110 kV Polotsk District Electrical Networks with the replacement of air circuit breakers with gas-insulated type VGT-110 kV (Russia).

17-20.09. The fourth international competition of operational and maintenance personnel of the Commonwealth states enterprises of electric distribution networks 2007 in Vitebsk.

29.11. The composition of the Orsha cogeneration plant included Production Republican Unitary Peat "Usvizh-Buk".

The Belarusian GRES included Production Republican Unitary Peat "Osintorf".

2008

January. Commissioning of the complex for the preparation of wood chips for the boiler operating at MBT on BelGRES.

30.03. Modernized steam turbine K-300-240 Lukoml with replacement of CVP, IPC, LPC unit № 2. Increasing the electric power of 15 MW.

1.12. The structure as "Hothouse" branch of RUE "Vitebskenergo" included KUSP "Greenhouse".

2009

12.06. For the first time in Vitebskenergo included 110/10 kV "Airport" modular type of firm «Siemens» in Polotsk.

19.06. At Lukoml unit included in the network 4 after upgrading № turbine K-300-240 with increasing power of 15 MW.

2.10. Opening of a memorial plaque on the administrative building of the Belarusian state district power station in honor of Igor Alexandrov.

25.12. The contract for the construction of hydroelectric complex of Polotsk HPP JSC "Technopromexport" (Russia).

2010

Lukoml. Reconstruction of the steam turbine flowing part K # 4, 300-240.

Reconstruction of the SS "Polotsk - District".

21.09. The contract for the construction of at Lukoml CCGT 400 MW with the China National Corporation for the import and export of machinery and equipment.

27.12. The contract for the construction of the Vitebsk hydroelectric power station with China National Corporation for electrical equipment.

1930

8.11. It puts into operation the first stage of the Belarusian State District Power Plant. first substations and power lines are put into operation 35 and 110 kV Vitebsk Orsha, and Moguilev Škłoŭ.

1931

15.05. Created Belarusian energy system.

1939

Put into operation the second phase of BelGRES, power capacity reached 32 MW.

1946

December. Commissioned Polotsk CHP.

1954

27.12. It puts into operation the first stage of the Vitebsk CHP 6.3 MW.

1961

November. It puts into operation the second phase of the Vitebsk CHP plant reached its design capacity of 56.3 MW.

December. Commissioned Orsha CHP capacity of 6 MW.

1962

11.12. It issued an order number 4 to the General Directorate of Energy and Electrification of the Council of Ministers of the Belarusian Soviet Socialist Republic on the formation of the district administration of power and electrification within the boundaries of the existing areas of the country. District Energy Management "Vitebskenergo" was established within the boundaries of the Vitebsk region.

27.12. Commissioned Novopolotsk CHP: the first turbine capacity of 60 MW.

1964

February. Lukoml started construction.

15.12. Established training center of Uzbekistan "Vitebskenergo" on BelGRES.

1966

December. "Energy Day" was celebrated for the first time in the USSR.

1969

April. Created Enterprise Vitebsk heat networks.

December. Put into operation the first unit Lukoml capacity of 300 MW.

1970

12.07. Vitebsk District Department of Energy and Electrification EN "Vitebskenergo" renamed in the area of ​​energy management and the electrification of the Vitebsk region RG "Vitebskenergo".

1971

December. "Vitebsk" was introduced 330 kV substation.

1972

Introduced substation 330 kV "Polotsk".

1974

August. Introduced eight units Lukoml, the station reached its design capacity of 2400 MW.

1977

Introduced 330 kV substation "Orsha".

1981

12.03. He was awarded the Order "Badge of Honor" by the Decree of the Presidium of the USSR Supreme Lukoml Council.

1982

Completed translation of 35-110 kV with wooden poles with concrete poles.

1986

Introduced the overhead line 750 kV Ignalina NPP - SS "Belarus".

1988

December. The structure of "Vitebskenergo" entered Lukoml and Novopolotsk CHP.

1991-1992

Translation Lukoml to burning natural gas.

1998

September. Introduced in the CCGT at the Orsha cogeneration plant capacity of 67 MW.

1999

December. Commissioned expander-generator set DGUE 5000 at Lukoml.

Information
Administrative procedures
Connection to the power supply system
Scheduled outages

 

Heads Vitebsk grid (1962-2014)

Vladimir Spiridonovich Davydovsky
1962-1972
Michael P. Kondratyev
1972-1978 
Leonid Scherbakov
1978-1988 
Valentin V. Gerasimov
1989-1991
Mikhail Samodeev
1991-2000
Alexander Ozerets
2000-2006
Pavel Ivanovich Kharitonov
2006-2014
Luzin Mikhail Vladimirovich
2014 – now