0,27–0,29 млрд кВт·ч

Annual power generation

80 МВт

Installed power

344 человек

Staff number

 

    The installed capacity is 80 MW. Annual electricity generation of 0.27-0.29 billion kWh. Annual heat output 650-780 thousand Gcal. The number of staff - 344 people.

    Vitebsk CHP commissioned in December 1954. In 2006, the worn out turbine unit was replaced. No. 3 with a capacity of 35 MW for a new one with a capacity of 40 MW. In 2011, the worn out turbine unit was replaced. No. 2 with a capacity of 35 MW for a new one with a capacity of 40 MW.

210604, Vitebsk, ul. M. Gorky, 104

Тел: 8 (0212) 37-34-01

Факс: 8 (0212) 37-34-41

E-mail: vst@vitebsk.energo.by

Information
Administrative procedures
Connection to the power supply system
Scheduled outages