0,27–0,29 млрд кВт·ч

Annual electric power generation

80 МВт

Rated Output Power

344 человек

Number of Personnel

   Its installed capacity is 80 MW. Annual electricity generation is 0.27-0.29 billion kWh. Annual heat output is 650-780 thous.Gcal. The number of staff is 344 people.

    Vitebsk CHPP was commissioned in December 1954. In 2006, the worn out turbine unit No. 3 with a capacity of 35 MW was replaced for a new one with a capacity of 40 MW. In 2011, the worn out turbine unit No. 2 with a capacity of 35 MW was replaced with a new one with a capacity of 40 MW.