Belorusskaya TPP

Card image cap

3,7–5 млн кВт·ч

Annual power generation

1,5 МВт

Installed power

268 человек

Staff number

Installed capacity is 4.75 MW. Annual electricity production of 13 million kWh. The annual heat supply is 103 thousand Gcal. The use of local fuels is about 21.8 thousand tons of equivalent fuel. in year. The branch includes: Belorussian state district power station, Baran mini-CHP, Osintorf CPT, Usvizh-Buk CD & VT.

Number of staff - 336 people.

The Belarusian State District Power Plant is the first-born of Belarusian energy. The first phase of the station was launched in 1930. In 2006, a 1.5 MW power plant using local fuels was commissioned. In 2012, a MW-based boiler with a capacity of 30 t / h was commissioned. In 2017, the Baran mini-CHP was connected to the MW, with an installed capacity of 3.25 MW and the Udvizh-Buk central heating and power transmission center.

211026, Vitebsk Region, Orshansky District, the settlement of Orekhovsk

Тел: 8 (0216) 23-05-32

Факс: 8 (0216) 23-05-32

E-mail: bst@vitebsk.energo.by

Information
Administrative procedures
Connection to the power supply system
Scheduled outages