138 million kWh

Annual power generation

40 mW

Station power

822 hectares

Reservoir area

4.1 million m³

Reservoir capacity

It was put into operation on July 31, 2017.

Vitebsk Hydroelectric Power Station was built by the Chinese contracting organizationNational Electrical Corporation (CNEEC). Station Power - 40 mW (4 hydrogenerators of 10 mW each).

In the course of construction, buildings and structures of the waterworks are constructed, the spillwaydam, earthen dam, 110 kV outdoor switchgear and navigation lock. Createda reservoir of 822 hectares with a capacity of 4.1 million m³ withNPU - 139.0 m.

Annual electricity generation is about 138 million kWh.